When you first notice the symptoms of a clogged sewer line turn off the water at the main supply or street level.
Cleanout on first floor toilet.
When it turns out a blockage is upstream of a particular cleanout you have to access it from another cleanout because the auger can t go upstream.
The sweep of the fitting makes it easy to insert an auger and reach a blockage located downstream from the cleanout.
After the toilet is removed the plumber can then use a drain machine to remove the clog.
Start by selecting the right plunger such as this accordion style tool available on amazon or another from our full list of recommendations for the best plunger.
This will identify what caused the clog and determine what needs to be done to clear it.
A cleanout located inside the building may be inside a wall or floor.
However the clog may not be removed as thoroughly because the pipes beneath the toilet are smaller.
The plumber will run a drain auger also called a plumber s snake through the sewer clean out to clear the clog.
Homeowners who have access to their sewer cleanout line typically a short round white pipe with a rubber cap located in the yard near the house can remove the cleanout cap during a backup to release pressure build up.
With the toilet bowl full of.
A two way cleanout at the transition of the building drain and sewer can substitute for an upper terminal cleanout only if the distance to the furthest horizontal drainage piping is within 100 feet.
Cleanouts are strategically placed to allow access to all sections of the sewer line.
This increases the cost of labor and the risk of damage to the toilet itself.
Piping above the first floor of the building is not required to have a cleanout.
Cleanouts are usually in the drain where there is a 90 degree turn and positioned in such a way that when you remove the cap you can easily work on the blockage.
If the auger doesn t clear the clog the plumber will use a fiber optic sewer line camera to look down the sewer line.
Where more than one change of horizontal direction greater than 45 degrees 0 79 rad occurs within 40 feet 12 192 mm of developed length of piping the cleanout installed for the first change of direction shall serve as the cleanout for all changes in direction within that 40 feet 12 192 mm of developed length of piping.
And send water outside instead of into the house.
A cleanout may be easily accessible in buildings that have a crawlspace or a basement.